The current position:Home > English > Product > Atomic ash series

YK-710 PU Putty


14224052362865720.jpg
Product features

YK - 670 PU putty, curing, high density of coating and close the gender is wonderful, excellent durability.Mainly used for wind turbine blades, etc.

Suitable substrate

FRP, steel plate, iron plate and old paint film, etc

Ratio of the construction

Atomic ash: curing agent = 6:1 2 (weight ratio)
Note: the operational time of 6-12 minutes (according to the proportion of curing agent and temperature changes in different)

The construction technology

Substrate processing: use P80 - P120 for blowing ash substrate surface of sand paper burnish, go to the oil and water, dry.
Mixed aside: will the Lord grey and form a complete set of curing agent by 6:1 2 mixed evenly, make the colour and lustre is consistent.
Coating: put the atomic ash in 6-12 minutes / 25 ℃ operational time, coating on the treated surface of the substrate.
3 hours after polishing, coating / 25 ℃, dry grinding.

Technical parameters

14224056755470716.jpg
Matters needing attention

1. The surface if there are air bubbles infiltration, must be thoroughly with scraper, leveling in order to ensure good adhesion.
2. PU putty with special curing agent, shall not be ash curing agent mixed with other atoms.
3. PU putty and hardener easy water curing, after open access should be kept sealed as soon as possible.Atomic ash with curing agent added back into the tank.
4. Store in a cool, dry place, away from heat and fire, avoid direct sunlight.
5. Storage time: 12 months / 25 ℃.

14224056649194258.jpg


清远雅克化工有限公司 @ All rights reserved 2015 | 粤ICP备06084242号 | The website construction:Qingyuan rubik's cube network
address:Qingyuan city, guangdong province high-tech development zone Silver light jia fu jia by 16 industrial zone tel:0763-3607328 email:yakoo@yakoo.com.cn

在线客服

树脂
点击这里给我发消息
原子灰
点击这里给我发消息
工业漆
点击这里给我发消息
点击这里给我发消息